Potable water treatment plant in TAGTABAZAR, Turkmenistan

Client: Eagle Property Investment L.P.

Equipment and performance:

Potable water treatment plant in Tagtabazar

- 625 m3 / h

- Design, supply, installation

- 2 pcs pumping stations, Q = 324 m3/h and Q = 384 m3/h with accumulation 3 x 1 000 m3

- Pipeline of water supply for WTP with length more than 7 000 m

- Sand filtration 750 m3/h on pressure filters

- Ionex filtration 375 m3/h

- Chemical preparation and chemical dosing

- Accumulation of drinking water (4 x 1 000 m3)

- Pumping station of drinking water

- Electrotechnical part, measurement, regulation, control system, cabling

In operation from 01/2019


Back